SL Particulars Description
1 RFP “EPC OF 50MWAC GRID CONNECTED SOLAR PV POWER PLANT ON EARTH CAPPED ASH POND-B OF OPGC AT IBTPS” dated 5th November 2024
2. GENERAL INFORMATION

OPGC intends to select an Engineering, Procurement and Construction (EPC) contractor for implementing the Project. The scope of work of the EPC Contractor shall be design, engineering, procure, manufacture, supply, packaging, transport, loading & unloading, construct, install, inspect, testing and commissioning the 50MWAC grid connected solar PV Project along with the related grid connection work and five (5) years of Operation and Maintenance service.

Request for Proposal (“RFP”), through on-line MSTC E-Procurement portal at  https://www.mstcecommerce.com/eprocn and on Domestic Competitive Bidding (DCB) basis, OPGC invites single stage, two part bid, Techno Commercial Proposal and Price Proposal ("Proposal (s)") from reputed parties, ("Bidder(s)"), meeting the Qualification Requirements stated in the ITB (document available for download) for EPC of 50MWAC grid connected solar PV Power Plant on earth capped Ash Pond-B of OPGC at IBTPS, Jharsuguda, Odisha and Five (5) years O&M.

3. START OF ISSUANCE OF RFP DOCUMENTS 12th November 2024
4. LAST DATE FOR PURCHASING RFP DOCUMENTS FROM OPGC 27th November 2024
5. NON-REFUNDABLE TENDER FEE INR 35,400/- inclusive GST@18%
6. BID SECURITY (BG) INR 2,50,00,000/-
7. CONTACT DETAILS

For any further information/clarification Bidders may contact us at the following address.

General Manager- Contracts

Odisha Power Generation Corporation Limited
7th Floor, Zone-A, Fortune Towers, Chandrasekharpur, Bhubaneswar- 751023, Odisha
E-Mail: contracts.corp.solar@opgc.co.in

Ph: +91-9338715401/ +91-9778901001

8. NOTICE INVITING TENDER (NIT)

NIT- RFP FOR EPC OF 50MWAC GRID CONNECTED SOLAR PV POWER PLANT ON EARTH CAPPED ASH POND-B OF OPGC AT IBTPS (Published on newspaper on 5th November 2024)

Notice of Newspaper publication

[Download Attachment link]

9. ITB ITB- RFP FOR EPC OF 50MWAC GRID CONNECTED SOLAR PV POWER PLANT ON EARTH CAPPED ASH POND-B OF OPGC AT IBTPS

ITB Document Bidder to refer Corrigendum No. 1 below for download of revised ITB

10.
CORRIGENDUM NO. 01 CORRIGENDUM NO. 01 to the NIT NO. OPGC/SOLAR/EPC, DATE: 5th NOVEMBER 2024

Corrigendum Document

[Download Attachment link]

A Revised ITB is available for Bidder’s download.

Revised ITB Document

[Download Attachment link]

 
| Feedback | Related Links | Careers | Archive | Contact Us | Sitemap | Photo Gallery |

© 2004, Odisha Power generation Coorporation.™ ® all rights reserved. || Disclaimer |
Site Powered By : Allay Software Solutions.