|
|
|
|
EOI for supply of materials |
Date: |
Enlistment EOI No |
DESCRIPTION |
Start Date |
End Date |
EOI/M/01/2025-26 |
Supply of Conveyor Belt (FR Grade) of Sizes 1600mm to
1800mm. |
01.04.2025 |
31.05.2025 |
EOI/M/02/2025-26 |
Gravimetric Feeder Belt for 210 MW unit |
08.04.2025 |
07.06.2025 |
EOI/M/03/2025-26 |
High Chrome Grinding Media Ball for BBD 4760 Mill |
08.04.2025 |
07.06.2025 |
EOI/M/04/2025-26 |
High Chrome Mill Liner for BBD 4760 Mill |
08.04.2025 |
07.06.2025 |
EOI/M/05/2025-26 |
ERW Pipe of different sizes from 50mm to 400mm |
15.04.2025 |
14.06.2025 |
EOI/M/06/2025-26 |
Air Preheater Basket for 210 MW unit |
22.04.2025 |
21.06.2025 |
EOI/M/07/2025-26 |
Structural Steels |
22.04.2025 |
21.06.2025 |
EOI/M/08/2025-26 |
Plastic Refractory for Boiler application |
29.04.2025 |
30.06.2025 |
EOI/M/09/2025-26 |
Alumina Castable Refractory |
29.04.2025 |
30.06.2025 |
EOI/M/10/2025-26 |
Forged Crusher Hammer Ring |
05.05.2025 |
05.07.2025 |
EOI/M/11/2025-26 |
Hardox Plates |
12.05.2025 |
12.07.2025 |
EOI/M/12/2025-26 |
Bag Filter for AHP/Silo |
12.05.2025 |
12.07.2025 |
EOI/M/13/2025-26 |
Boiler Tubes for 210 MW unit |
19.05.2025 |
19.07.2025 |
EOI/M/14/2025-26 |
CPVC Pipes |
19.05.2025 |
19.07.2025 |
EOI/M/15/2025-26 |
Boiler Tube Protection Shield |
26.05.2025 |
26.07.2025 |
|
|
|
|